Home > Services > Planning > Planning Application Details

Planning application details ref: 19515 (Kilkenny County Council)

Associated Application Details


Decision Progress Indicator
100%

Received
23/07/2019
Decision
16/09/2019

Actions

Planning Application: 19515 (Kilkenny County Council)

File Number: 19515
Application Type: PERMISSION Planning Status: APPEALED
Received Date: 23/07/2019 Decision Due Date: 16/09/2019
Validated Date: 23/07/2019 Invalidated Date:  
Further Info Requested:   Further Info Received:  
Withdrawn Date:   Extend Date:  
Decision Type: CONDITIONAL Decision Date: 13/09/2019
Leave To Appeal:   Appeal Date: 10/10/2019
Commenced Date: Submissions By:

Applicant Details

Applicant Name:     Greener Ideas Limited
Applicant Address:
Phone Number: Fax Number: Ph:
Corresp. Address:

Proposed Development

Development Description: for a 10 year planning permission for the construction of a Battery Energy Storage System (BESS). The BESS will consist of: up to 10 no. containerised battery storage modules (up to 14.6m in length, 2.8m in height and 2.4m in width) and ancillary equipment including up to: 14 no. transformers, 28 no. inverters, 14 no. ring main units; a 38kV electrical substation and ESB substation building (10m in length, 6.2m in height and 7.4m in width); electrical equipment building (20m in length, 8.2m in height and 7.4m in width); underground surface water attenuation tank; underground foul storage tank; access and internal circulation road with new junction onto existing IDA private road; 6 no. car parking spaces; landscaped berm wall up to 2m height and native tree and scrub planting, screening wall up to 3m height; 3m high paladin security fence; and all other associated site development works including surface water and foul drainage required to facilitate the development
Development Address: Indutrial Development Agency (IDA) Business and Technology Park, Purcellsinch, Dublin Road, Kilkenny
Architect Name: Mark McCarthy Location Key: PURCELLS INCH KILKENNY
Electoral Division: Planner: Arlene O'Connor
Social Housing Exempt:   Plan Enforcement #:  
IPC License Required: No Waste License Required: No
Protected Structure: No Protected Structure #:  
Development Name:    

Comments

Significant Case Flag: Comments:

Decision

Decision Date: 13/09/2019 Manager Order #: 583
Decision Type: CONDITIONAL Number of Conditions: 15
Downloads a Microsoft Word Document (Document Size 76.74609375 Kb)

Download a Free Word viewer
Grant Date:   Grant Mangers Order #:
Section 47 Apply?: Part 5 Apply ?:
Expiry Date:  
Decision Description: for a 10 year planning permission for the construction of a Battery Energy Storage System (BESS). The BESS will consist of: up to 10 no. containerised battery storage modules (up to 14.6m in length, 2.8m in height and 2.4m in width) and ancillary equipment including up to: 14 no. transformers, 28 no. inverters, 14 no. ring main units; a 38kV electrical substation and ESB substation building (10m in length, 6.2m in height and 7.4m in width); electrical equipment building (20m in length, 8.2m in height and 7.4m in width); underground surface water attenuation tank; underground foul storage tank; access and internal circulation road with new junction onto existing IDA private road; 6 no. car parking spaces; landscaped berm wall up to 2m height and native tree and scrub planting, screening wall up to 3m height; 3m high paladin security fence; and all other associated site development works including surface water and foul drainage required to facilitate the development

Appeal Details

Notification Date: 15/10/2019 BP Reference #: ABP-305625-19
Appeal Type: THIRD PARTY File Forward Date :  
Submission Due Date : 11/11/2019 Submission Sent Date : 18/10/2019
Appeal Decision : Decision Date :  
Withdrawn Date :   Dismissed Date :  
Reason :  
Data Protection:

The use of the personal details of planning applicants, including for marketing purposes, may be unlawful under the Data Protection Acts 1988-2003 and may result in action by the Data Protection Commissioner against the sender, including prosecution.

Kilkenny County Council - Privacy Policy

Disclaimer

Covid 19 Following the signing of Ministerial Orders under Section 251A of the Planning and Development Act 2000, as amended, on 29 March 2020 which result in an extension of time for a range of specified/appropriate periods and timelines it should be noted that these timelines are not reflected in the records accessible under the Planning Enquiry System.

The Revised Planning Timelines are listed at the following link
Planning & Development Act 2000 (as Amended) Emergency Measures in the Public Interest

Disclaimer:

While every care has been taken to display accurate information, Kilkenny County Council will not be held responsible for any loss, damage or inconvenience caused as a result of any inaccuracy or error within. All information on the site including the planning enquiries system is updated on a regular basis. While every effort is made to ensure all information is accurate on the site, the Planning Authority cannot guarantee this at any particular point in time. Should you need to rely on information provided in these pages please obtain separate confirmation from the staff at the Planning Public Counter.

Kilkenny County Council, County Hall, John Street, Kilkenny
Tel: +353 (0) 56 7794000 | Fax: +353 (0) 56 7794004 | Email: info@kilkennycoco.ie | Emergency outside office hours: : 1890 252 654
Privacy | Disclaimer