Planning Application: 23141 (Kilkenny County Council)
File Number:
23141
Application Type:
PERMISSION
Planning Status:
APPLICATION FINALISED
Received Date:
07/06/2023
Decision Due Date:
28/05/2024
Validated Date:
07/06/2023
Invalidated Date:
Further Info Requested:
31/07/2023
Further Info Received:
01/05/2024
Withdrawn Date:
Extend Date:
Decision Type:
Conditional
Decision Date:
28/05/2024
Leave to Appeal:
Appeal Date:
Commenced Date:
Submissions By:
Applicant Details
Applicant name:
Richard Walsh
Applicant Address:
Phone Number:
Fax Number:
Corresp.
Address:
c/o Niall Fagan, Nextgen Design & Build Ltd, 3 Francis Lane, Newbridge, Co Kildare
Applicant Details
Proposed Development
Development Description:
(A) 8 No. Semi -detached, two storey, three bedroom dwellings, (with optional ground floor rear extensions) (B) proposed vehicular entrance, (C) Proposed internal roads/ footpaths and public lighting, (D) Proposed connection to existing Foul, Storm and Water main infrastructure. (E) Proposed diversion of existing foul drain. (F) Demolition of 2 No. Existing sheds, (G) Demolition of front boundary wall, (H) Proposed Landscaping/boundary treatments and all associated site works
Development Address:
Tullaroan, Co Kilkenny
Architect Name:
Niall Fagan
Location Key:
TULLAROAN KILKENNY
Electoral Division:
Planner:
Maureen Daly
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
No
Waste Licence Required:
No
Protected Structure:
No
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
Comments:
Period of F.I. extended to 8th May 2024
Decision
Decision Date:
28/05/2024
Manager Order:
296
Decision Type:
Conditional
Number of Conditions:
19
Grant Date:
28/06/2024
Grant Managers Order #:
296
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
27/06/2029
Decision Description:
(A) 8 No. Semi -detached, two storey, three bedroom dwellings, (with optional ground floor rear extensions) (B) proposed vehicular entrance, (C) Proposed internal roads/ footpaths and public lighting, (D) Proposed connection to existing Foul, Storm and Water main infrastructure. (E) Proposed diversion of existing foul drain. (F) Demolition of 2 No. Existing sheds, (G) Demolition of front boundary wall, (H) Proposed Landscaping/boundary treatments and all associated site works