18573 |
APPLICATION FINALISED |
PERMISSION |
C |
30/08/2018 Thursday |
EirGrid plc |
Great Island to Kilkenny Overhead Line |
for develop at existing Grt Isl-Kk 110kV Overhead Line, approx 49kms long.Approx 46.4km of existing circuit located within functional area of CoKk with approx 2.6km located within CoWex.The uprate works within CoKk will be undertaken betwn structure INT16 in townland of Drumdowney Upr,near admin border betwn Co's Wx&Kk and structure EM258 in twnland of Scart(ED Dunbell),east of KkCity.Within Co Kk existing circuit extends across twnlands of Drumdowney Upr,Murtaghstown,Luffany, Rathpatrick,Treanaree,Carriganurra,Nicholastown,Atateemore orBlackneys,Ballincrea, Fahy,Rathnasmolagh,Knockbrack,Ballinlammy,Haggard, BallyfasyLwr&Upr, Ballywairy, Darbystown,Ballallog,Listerlin,Brabstown,Ballyconnaught,Ballykenna,Garrandarragh, Ballyvool,Firgrove,Bohilla,Ballycocksoost,Coolsillagh,Kilmacshane,Kilcullen,Ruppa, Mungmacody,Cloghscregg,Castlegarden,Kilmanaheen,Dungarvan(EDBennettsbridge), Dungarvan Glebe,Cloghala(EDBennettsbridge),Ballynaboley,Smithstown(EDDunbell), Clashwilliam Td(EDDunbell),Blanchvillestown,Grove(EDDunbell),Roughfield,Rathcash, Rathgarvan orClifden,Maddockstown,Ballynamona,Highrath &Scart(EDDunbell). Uprate of existing circuit within CoWx will be undertaken within twnland of Grt Isl, between structure EM1 at Grt Isl Substn&structure INT15 near admin border between Co's Wx&Kk. Developm will consist of uprate of Grt Isl-Kk 110kv Overhead Line which will primarily include:re-stringing conductor withhigher capacity conductor,replacement of large proportion of existing structures,breaking out & reconstruction of concrete foundation & shear blocks of metal masts, painting of mast structures, replacement of insulators, crossarms, stays and/or fittings on existing structures &fitting/replacement of bird flight diverters.No additional structures proposed along existing circuit.Any replacement structures will be constructed at,or immediately adjacent to existing structures they will replace&will be of generally similar height & appearance. Assoc temp sitedevelop works to gain access to existing structures incl clearance of vegetation, disassembly & reassembly of stone walls&gate posts&removal & reinstatement of exist fencing.The prop dev includes all other temp assoc&ancillary site dev works reqd for uprate of exist circuit,incl install of silt traps,silt fences, stone rds, bogmats & clearspan bridges.No additional struct, no alteration to nature,extent, alignment, character or voltage of exist elect infrastruct is proposed.A NIS forms part of this application |