Planning application details ref: 19515 Kilkenny County Council

100%100% Complete (warning)

Planning Application: 19515 (Kilkenny County Council)
File Number: 19515
Application Type: PERMISSION Planning Status: APPLICATION FINALISED
Received Date: 23/07/2019 Decision Due Date: 16/09/2019
Validated Date: 23/07/2019 Invalidated Date:
Further Info Requested: Further Info Received:
Withdrawn Date: Extend Date:
Decision Type: Conditional Decision Date: 13/09/2019
Leave to Appeal: Appeal Date: 10/10/2019
Commenced Date: Submissions By: 26/08/2019

Applicant Details

Applicant name: Greener Ideas Limited
Applicant Address:
Phone Number: Fax Number:
Corresp. Address: C/- Mark McCarthy (Mott MacDonald Ireland Limited), South Block, Rockfield, Dundrum, Dublin 16, D16 R6V0

Applicant Details


Proposed Development

Development Description: for a 10 year planning permission for the construction of a Battery Energy Storage System (BESS). The BESS will consist of: up to 10 no. containerised battery storage modules (up to 14.6m in length, 2.8m in height and 2.4m in width) and ancillary equipment including up to: 14 no. transformers, 28 no. inverters, 14 no. ring main units; a 38kV electrical substation and ESB substation building (10m in length, 6.2m in height and 7.4m in width); electrical equipment building (20m in length, 8.2m in height and 7.4m in width); underground surface water attenuation tank; underground foul storage tank; access and internal circulation road with new junction onto existing IDA private road; 6 no. car parking spaces; landscaped berm wall up to 2m height and native tree and scrub planting, screening wall up to 3m height; 3m high paladin security fence; and all other associated site development works including surface water and foul drainage required to facilitate the development
Development Address: Indutrial Development Agency (IDA) Business and Technology Park, Purcellsinch, Dublin Road, Kilkenny
Architect Name: Mark McCarthy Location Key: PURCELLS INCH KILKENNY
Electoral Division: Planner: Arlene O'Connor
Social Housing Exempt: Plan Enforcement #:
IPC Licence Required: No Waste Licence Required: No
Protected Structure: No Protected Structure #:
Development Name:

Proposed Development


Comments

Significant Case Flag: Comments:

Decision

Decision Date: 13/09/2019 Manager Order: 583
Decision Type: Conditional Number of Conditions: 15
Downloads a Microsoft Word Document (Document Size 76 Kb)

Download a Free Word viewer
Grant Date: 24/09/2020 Grant Managers Order #:
Section 47 Apply?: Part 5 Apply?:
Expiry Date: 23/09/2030
Decision Description: for a 10 year planning permission for the construction of a Battery Energy Storage System (BESS). The BESS will consist of: up to 10 no. containerised battery storage modules (up to 14.6m in length, 2.8m in height and 2.4m in width) and ancillary equipment including up to: 14 no. transformers, 28 no. inverters, 14 no. ring main units; a 38kV electrical substation and ESB substation building (10m in length, 6.2m in height and 7.4m in width); electrical equipment building (20m in length, 8.2m in height and 7.4m in width); underground surface water attenuation tank; underground foul storage tank; access and internal circulation road with new junction onto existing IDA private road; 6 no. car parking spaces; landscaped berm wall up to 2m height and native tree and scrub planting, screening wall up to 3m height; 3m high paladin security fence; and all other associated site development works including surface water and foul drainage required to facilitate the development

Appeal Details


Appeal Details
Notification Date: 15/10/2019 BP Reference #: ABP-305625-19
Appeal Type: THIRD PARTY File Forward Date:
Submission Due Date: 11/11/2019 Submission Sent Date: 18/10/2019
Appeal Decision: MODIFIED Decision Date: 24/09/2020
Withdrawn Date: Dismissed Date:
Reason: